Siemens SGT-800 - 51.8 MW, 2024, Zero Hours
1 complete package | 51.8 MW | 2024 | New, zero hours | Final 60 Hz configuration. Representative image shown.

Availability notice: Inventory changes frequently. Equipment available today may no longer be available tomorrow. Please contact HonFin Energy Assets to confirm current availability before proceeding.
One Siemens SGT-800 full generating package rated at 51.8 MW. The September 2026 equipment documents describe a 2024 unit as brand-new, with zero operating hours and no commissioning history.
Equipment specifications
- Listed quantity: 1 complete generating package
- Baseline project rating: 51.8 MW
- Year: 2024
- Listed condition: Brand-new; zero operating hours; never commissioned
- Configuration: Open / simple cycle
- Final frequency: 60 Hz, with preparation by a certified service partner
- Final generator voltage: 18 kV
- Fuel system and detailed scope: Confirm with HonFin
- Listed location: International
Availability and delivery
The September 2026 proposal estimates approximately three months from letter-of-intent execution, including international transit, on a CIF USA delivery basis. Confirm current availability, preparation requirements, shipping scope and delivery schedule with HonFin.
Representative image: Siemens SGT-800 turbine; the exact offered package may differ. This is not a photograph of the specific equipment offered. Request unit-specific photos and final package details. Image source: Siemens Energy.
Request a quote for this equipment
Tell us your required quantity, project location and target delivery date. HonFin will confirm availability, final specifications, scope and pricing.
REQUEST A QUOTE - Siemens SGT-800 - 51.8 MW, 2024, Zero Hours
Call +1 708 289 8162 | tom@hfenergyassets.com
Inventory reference: consolidated September 4 and September 8, 2026 SGT-800 documents. Listed specifications and performance are subject to final verification and site conditions.
