GE LM2500+G4 DLE with Boiler
Gas Turbines | 33 MW | 50 Hz. View specifications and package scope.

Availability notice: Inventory changes frequently. Equipment available today may no longer be available tomorrow. Please contact HonFin Energy Assets to confirm current availability before proceeding.
GE LM2500+G4 DLE Unit 2 supplied with boiler and balance of plant. The source lists manufacture in 2018, installation in China in 2020, and approximately 100 operating hours after commissioning. Preservation maintenance and optional disassembly, shipping and installation scope can be discussed with HonFin.
Equipment specifications
- Nominal output: 33 MW
- Listed quantity: 1 package
- Frequency: 50 Hz
- Fuel: Natural gas / dual fuel
- Installation: Stationary
- Listed location: China
Equipment image from the supplied specification sheet.
Request a quote for this equipment
Tell us your required quantity, project location and target delivery date. HonFin will confirm availability, final specifications, scope and pricing.
REQUEST A QUOTE - GE LM2500+G4 DLE with Boiler
Call +1 708 289 8162 | tom@hfenergyassets.com
Inventory reference: July 9, 2026, with supporting equipment sheets. Availability and listed quantities are subject to confirmation. Nominal performance depends on site conditions and final configuration.
