GE LM2500 - Two 21 MW Rebuild Units

Gas Turbines | 2 x 21 MW; 42 MW combined | Texas rebuild package. Representative image shown.

Representative GE LM2500 core turbine image; not the two 21 MW rebuild units offered.

Availability notice: Inventory changes frequently. Equipment available today may no longer be available tomorrow. Please contact HonFin Energy Assets to confirm current availability before proceeding.

Two GE LM2500 aeroderivative gas turbine generator units with a combined nameplate output of 42 MW (21 MW per unit). Proposal LM2500-2026-01, revised July 20, 2026, describes the units in final rebuild and completion at a Texas, USA facility. Request the latest completion status and unit-specific documentation with your quote.

Equipment specifications

  • Nominal output: 21 MW per unit; 42 MW combined
  • Listed quantity: 2 units
  • Frequency: Confirm with HonFin
  • Fuel: Dual-fuel capability described in the proposal; final fuel specifications to be confirmed
  • Control system: RX3i, installed and integrated per the proposal
  • Condition: Final rebuild/completion as described in the July 20, 2026 revised proposal
  • Rebuild location: Texas, USA

Rebuild scope and delivery

The proposal reports mechanical assembly and detailing complete, with electrical cabling and verification completed and instrumentation installed, calibrated and loop-checked. The dual-fuel scope includes new manifolds, fuel nozzles, J-tubes, brackets and associated components installed per OEM guidelines.

The source estimates 14 weeks from project start to completion and availability, FOB Texas, USA, with commissioning and startup testing before release. Current schedule, package scope and warranty terms will be confirmed with the quotation.

Representative image: GE LM2500 core turbine. This is not a photograph of the two units offered; the generator package and configuration may differ. Request unit-specific photos from HonFin. Image source: GE Vernova.

Request a quote for this equipment

Tell us your required quantity, project location and target delivery date. HonFin will confirm current availability, final specifications, package scope and commercial terms.

REQUEST A QUOTE - GE LM2500 - Two 21 MW Rebuild Units

Call +1 708 289 8162 | tom@hfenergyassets.com

Inventory reference: Proposal LM2500-2026-01, revised July 20, 2026. Availability, quantities, delivery estimates and performance are subject to confirmation and final configuration.