top of page

BACK TO INVENTORY

GE Frame 9HA.01 Generator Package

Gas Turbines | 372.646 MW | 50 Hz. Representative image shown.

Representative image of GE 9HA family turbine; not the specific unit offered.

Availability notice: Inventory changes frequently. Equipment available today may no longer be available tomorrow. Please contact HonFin Energy Assets to confirm current availability before proceeding.

GE Frame 9HA.01 Generator Package is included in the HonFin Energy Assets inventory sheet. Review the listed specifications below and request a quotation for the required project scope.

Equipment specifications

  • Nominal output: 372.646 MW
  • Listed quantity: 1 package
  • Frequency: 50 Hz
  • Fuel: Natural gas
  • Installation: Stationary
  • Listed location: Europe

Representative image: GE 9HA family turbine. This is not a photograph of the specific equipment offered. Unit-specific photos and final package details are available on request. Image source: GE Vernova.

Request a quote for this equipment

Tell us your required quantity, project location and target delivery date. HonFin will confirm availability, final specifications, scope and pricing.

REQUEST A QUOTE - GE Frame 9HA.01 Generator Package

Call +1 708 289 8162 | tom@hfenergyassets.com

Inventory reference: July 9, 2026, with supporting equipment sheets. Availability and listed quantities are subject to confirmation. Nominal performance depends on site conditions and final configuration.

bottom of page