top of page

BACK TO INVENTORY

GE Frame 7EA 3x1 Combined Cycle

Combined Cycle | 340 MW plant | 60 Hz. View specifications and package scope.

GE Frame 7EA 3x1 Combined Cycle - supplied equipment image

Availability notice: Inventory changes frequently. Equipment available today may no longer be available tomorrow. Please contact HonFin Energy Assets to confirm current availability before proceeding.

A complete combined-cycle plant consisting of three GE Frame 7EA gas turbine generators, three dual-pressure HRSGs and one FUJI steam turbine generator. The source describes modular operation in simple cycle during initial phases and transition to the full 3x1 combined-cycle configuration. Model GFD71EDN1; water injection is listed for NOx control.

Equipment specifications

  • Nominal output: 340 MW plant
  • Listed quantity: 1 plant: 3 gas turbines plus 1 steam turbine
  • Frequency: 60 Hz
  • Fuel: Natural gas / distillate
  • Installation: Stationary combined cycle
  • Listed location: Confirm with HonFin

Equipment image from the supplied specification sheet.

Request a quote for this equipment

Tell us your required quantity, project location and target delivery date. HonFin will confirm availability, final specifications, scope and pricing.

REQUEST A QUOTE - GE Frame 7EA 3x1 Combined Cycle

Call +1 708 289 8162 | tom@hfenergyassets.com

Inventory reference: July 9, 2026, with supporting equipment sheets. Availability and listed quantities are subject to confirmation. Nominal performance depends on site conditions and final configuration.

bottom of page